HEAVY PLATFORM AND TOP GAS SCUBBER
PROJECT
Comprehensive engineering of top gas scrubbing system and its removable heavy platform, under ASME Section VIII regulations.
Project Scope
- Complete structural calculation
- Steel structure and foundations design
- Associated piping system development
- Construction drawings preparation
- Assembly procedures development
- Technical visits to suppliers
- Fabrication and assembly monitoring at plant
Management
- Preparation of bidding documents and technical specifications
- Detailed cost estimation and budgeting
- Technical support in quotation processes